Work Week

Fulford operates from 6:30 AM until 5:00 PM Eastern Time on week days.
As our market fluctuates we activate our second shift. During that period we close at 11:00 PM daily.


Our facility has 25,000 square feet of manufacturing space and sits on 4.3 acres. When we utilize our second shift, we operate at about 50% of our capacity. If warranted, there is ample room for expansion.

Production Resources

Eyelet Presses:

35 eyelet presses from size 0-15 and ranging in stations from 4-12 each.

Four-Slide Machines:

5 wireform machines. Two each of Baird #2 and # 3, and one Baird#3 Longstroke.

Deburring and Finishing:

We operate a fully equipped finishing department to ensure our product is properly deburred, cleaned, dried and protected by rust inhibitor.

Heat-treating, Electroplating, Casting, Epoxy:

We maintain contract relationships with approved and constantly monitored vendors for these services.

Assembly & Bagging:

We have full capability to perform automatic or manual assembly and/or automatic or manual bagging.

Technical Resources

Our Tool Room is equipped with multiple conventional and high speed lathes, milling machines, surface grinders, several drill presses, screw arbors and a welding department .


We employ 4 Engineers that produce in-house drawings, Flow Charts, Production Control Plans, and Failure Mode Effects Analyses. We are GD&T knowledgeable and thoroughly immersed in statistical techniques. We perform Production Part Approval Process (PPAP) on most parts.


We are EDI, FTP, Fax and 1D/2D Bar Code Capable.


We operate our own onsite mail and file servers. All data is backed up daily. Website hosting for our two web sites is done off site but managed internally.